WPC door frame making machine for Africa customer Tested successfully in our factory

time2020/03/11

We have finished the Production of WPC door frame making machine for our Africa customer. today we have tested the complete production line with our formulation. the testing is successfully for making high quality WPC door frame products according to customized sizes.
In the testing, we used 40% wood and CaCo3 mixing with 50% PVC for making low cost and high quality WPC door frame, the average material cost is around 0.7-0.8 USD/kg only.
WPC door frame making machine testing video
We have finished the Production of WPC door frame making machine for our Africa customer. today we have tested the complete production line with our formulation. the testing is successfully for making high quality WPC door frame products according to customized sizes.
In the testing, we used 40% wood and CaCo3 mixing with 50% PVC for making low cost and high quality WPC door frame, the average material cost is around 0.7-0.8 USD/kg only.
Details of the wpc door frame making machine
Double cavity L type door frame mold
Double cavity L type door frame mold
High quality mold can ensure the good quality of the products
Door frame mold
Door frame mold
Turnkey project for the wpc door frame making machine
WPC door frame mold
WPC door frame mold
We can design the mold according your requirments
WPC door frame production line
WPC door frame production line
We provide all machines from raw material mixer to final products
Turnkey service for WPC door project

Before order

1,Customized the production line and auxiliary machine according final products,and show all technical parameter to buyer,provide the turnkey project to customer.

2,Free machine running when customer visit our factory for quality inspection .

3, Design the mold drawing according customer requirements.

4,Design the machine layout and water and electricity layout according buy factory.

5,Any technical parameter support if customer in need.
In production

1,Confirm the mold drawing after received the down payment.

2,Start the product asap and updates the production status every 10 days.

3,Confirm the water and electricity layout and other accessories,ensure plant preparations well before the machines arrives.

4,Determine raw material preparation in customer factory.

5,Within 60 working days after receiving the advance payment, the seller shall notify the buyer to carry out the inspection

6,Arrange machine and mold testing to ensure customer or third party inspection satisfaction.

7,The seller shall complete the packing of the goods within 15 working days after receiving the full payment and be ready to ship.

8,The seller shall inform the buyer of the exact loading time and the buyer shall arrange to supervise the scope of the loading.
Machine in customer factory

   1,After determining the date of the machine arrived customer's factory, arrange our professional engineer to install and debug the machine.


    2,What the engineer should to do at the customer's plant:
2.1 Quickly install, debug the machine to normal operation and ensure product good quality products.

2,2 Provide the formula for production.

2.3 Teach workers how to use and maintain machines,solutions to daily problems in production

2.4Any production technical support for customer need.


3,Technical support online

If any problems when production we will reply online asap,within 24 hours to give the solution.


4, Warranty

4.1 Warranty period: 12 months from the first day of operation of the machine in the customer's warehouse
   4.2 The seller shall guarantee that service and spare parts are free of charge throughout the warranty period of the equipment.

4.3Lifetime service: After the 12-month warranty clause, the seller should provide lifelong service for the goods sold and provide the buyer with the payment for the required spare parts.